WorkingFlo

Operations Command Center

Selected Line

Login

Not logged in.

Forgot password?

Production Board

Schedule

Schedule Status
No schedule loaded
Current / Last Started
--
Next Product
--
Projected Final Wrap Out
--

Remaining Work

Load a schedule to calculate remaining work.
Current Flowers week
Pick a week
Choose the whole production week from the calendar.

No schedule imported yet.
Import a schedule to begin.

Settings

WorkingFlo

Loading...
Setup Center

Edit by bakery and line

Region

1
Loading regions...

Bakery

2
Select a region first.

Line

3
Select a bakery first.

Users

Loading users...

Roles

Loading roles...

Dispatch & Deadline Rules

Currently editing: Selected bakery / line

Default Dispatch Deadline

Select a line first.

Product-Specific Dispatch Rules

Select a line first.

Production Rules

Currently editing: Selected bakery / line

Production Flow Timing

Standard Changeover

Minutes applied between every product by default (when "Standard changeover" is selected on a row). Set to 0 to disable.

Dough Interval (Room for More)

Minutes per dough used by the Capacity "Room for More" card to estimate how many more doughs fit before the next dispatch is at risk. Leave blank to use the line's live average (total run time ÷ total doughs) from the current schedule.

Dough Times (min per dough)

Scheduled minutes per dough for every product on this line — this drives the whole mixer schedule. A grey value means automatic: it comes live from the Capacity Report (or the Excel's Oven Capacity sheet) and updates whenever you re-import. Type a number to override it manually; clear the box and Save to go back to automatic. ✕ removes a product from this line's list (it returns if a future schedule upload still has it).

Select a line first.

Capacity Report (SAP)

Select a line first.

Product Names

Every product that comes in on an uploaded schedule is saved here automatically. Give any product a display name and WorkingFlo will recognize it and use that name every time the schedule is re-uploaded. Save an empty box to go back to the original name.

No products saved yet.

Manual Changeover Types

Define changeover types you can assign per product row (e.g. Pan Change, Cleanout). Selecting one overrides the standard changeover for that row.

Select a line first.

Regions / Locations / Lines

Loading regions...

Activity Log

Loading...